OASYS - Offshore Acoustic System
  • Home
  • About
    • Contact
    • Privacy Policy
  • News
  • OASYS
    • OASYS Cable
    • OASYS Object
    • OASYS Pipe
  • Search
  • Menu Menu
  • LinkedIn

Automatic object tracking

OASYS’ features automatic point-cloud based object detection which is applicable to various operations:

  • Tracking objects that are lowered to the seabed: quadrant deployment, mattress installation & deployment of subsea structures
  • Tracking of objects on the seabed such as boulder clearance of trenching ploughs

Accurate object positioning requires high-resolution data. OASYS uses 2D multibeam echosounders (MBES) with a large swath width (10° to 160°), sounding depth and resolution (0.45° x 0.9° at 450kHz) in order to obtain sufficient data quality and position accuracy.

Download

OASYS Plough Tracking Flyer

OASYS Mattress Installation Flyer

vessel-fixed

MATTRESS INSTALLATION MONITORING

OASYS it’s object recognition capacity is perfect to monitor the position of objects in the water column. The installation of subsea protection mattress is a perfect application:

  • The position, altitude and rotation of the mattress frame is tracked instantly and compared with the target laydown position in order to provide correction values
  • An installed mattress can be surveyed instantly and its location can be used for the installation of the consecutive mattress
  • The system is vessel-fixed and therefore not influenced by current flow velocities
  • Reduce dependency of ROVs when the OASYS is combined with a remote release system on the mattress deployment frame

ASV-based

Boulder clearance / trenching monitoring

Use OASYS from an ASV to monitor plough-based boulder clearance / trenching operations. Key benefits:

  • Monitor the position, heading and orientation of the plough in real-time and compare it with the target route
  • Perform quality-control on the plough performance as disturbed seabed profile and rock berms are directly visible
  • Get a direct indication of the plough’s scouring depth

Posts

  • OASYS on HOW32026-03-30 - 12:02

    ECE Offshore is proud to have supported Jan de Nul on the Hornsea 3 Offshore Wind export cable campaign, providing OASYS Touchdown Point Monitoring services throughout the installation. Hornsea 3 is one of the largest offshore wind projects currently under development, and the export cable campaign presented exactly the kind of schedule-critical, high-stakes environment where […]

Popular
  • OASYS on HOW32026-03-30 - 12:02
Recent
  • OASYS on HOW32026-03-30 - 12:02
Comments
Tags
cable monitoring OASYS UDS

Archives

  • March 2026

Categories

  • OASYS Cable

Pages

  • About
  • Contact
  • Home
  • News
  • OASYS
  • OASYS Cable
  • OASYS Object
  • OASYS Pipe
  • Privacy Policy

Categories

  • OASYS Cable

Archive

  • March 2026
© Copyright - OASYS - Offshore Acoustic System - powered by Enfold WordPress Theme
Scroll to top